Solutions for Engineers and Estimators

Consistent Surveys. All the Details. Accurate Estimates.

Designs are Difficult Without the Details

How do you provide an accurate estimate without the right information?
Consistent site surveys increase efficiency and accuracy

 

engineer System Surveyor desktop web-app

Garbage in, garbage out.

The wrong information or inability to see exactly what the customer needs leads to inaccurate, untimely design and delayed estimates.

Going to every site walk isn’t scalable.

It’s hard to leverage the best engineering resources against multiple projects when they’re out in the field. 

Be There Virtually for Every Site Walk

Leverage the best engineering talent across more sales opportunities.

Get the full picture of customer needs
Get a high-level site survey, photos, requirements in one place. No need to be on-site and no stone unturned.
Enjoy consistent site surveys from sales
No matter the experience level of the surveyor, get detailed information that will inform the right system design, the first time.
Estimate accurately for better margins
Design and build the bill of materials and a digital as-built in real-time. Cloning you and your team and saving hours without all the email.
Previous
Next

Upgrading Customer Experience with Digital System Design Tool

Continuity across Sales, Design, Installation, and Maintenance

Learn how Tech Electronics enhanced their services via an integrated, companywide process. 

“[Before System Surveyor] We had to hope we labeled the photos correctly or remember later where each device was supposed to go after a day of customer visits. Cobbling everything together like this was inefficient and made it difficult to gather all the information we needed.”
Bienson Jones
Bienson Jones
Tech Electronics
testimonial
“Before System Surveyor, we would have a rushed site walk and would get back to the office with paper notes and pictures and realize that we had forgotten a lot of information. Now we can send a salesperson into the field to capture everything we need the first time and send it back to the engineer right from the field so they can start working on it. It cuts down on 50% of the workload on the backside and improves it 30-40% while you're in the field”
Cleve Cary
Senior Director Physical Security

Get Started

Try it free and see what other professionals are talking about.